

Installations
Professional commissioning of your new injection moulding machine
When a new injection moulding machine is delivered, we ensure professional and structured on-site commissioning. Our experienced field service team follows a fixed protocol to guarantee that all machine functions are fully tested, adjusted, and validated. From the initial electrical connection to the final cycle check – every detail is inspected and documented to ensure a safe and reliable startup.
Fully operational within a few days
Thanks to our efficient approach, your new machine is usually fully operational within a few days. We coordinate the schedule closely with you to minimize disruption to your ongoing production. During commissioning, we optimize the settings based on your moulds and production requirements, ensuring the machine performs at its best right from day one. It is important that your site has the necessary basic facilities in place, such as compressed air, cooling water, adequate electrical supply, a flat and stable floor, and suitable lifting or hoisting equipment for placement.
Ready for production, ready for the future
Upon completion of the commissioning, you will receive a clear report, and we will officially hand over the machine to your team. If desired, we also provide operator training or technical instruction, so your staff becomes familiar with the controls and settings. This ensures a smooth, trouble-free transition to a modern and efficient production process – fully on schedule and without surprises
Installations

tips & tricks
Tips for preparing installations
Proper preparation is crucial for a successful machine installation. It ensures efficiency, safety, and minimizes costly delays. Thorough planning lays the foundation for optimal performance from day one.